MCS certified

Solar Panels in United Kingdom

Rooftop solar is the fastest way to cut a fixed monthly bill. Modern panels run 25+ years with a 25-year performance warranty, and most homes reach payback in 6–10 years.

Typical install
£7,400+
bill saving / yr
£780
Currency
GBP
  • Tier-1 panels with 25-year warranties
  • Battery-ready hybrid inverters
  • Grant and rebate paperwork handled

Free quote request

Get matched in 4 steps

1/4

Solar Panels installers in United Kingdom

Popular in UK
Service

3 installers for solar in United Kingdom

Accredited heat pump installer

4.9(143)Manchester
Verified accredited

Business name, phone, email and website are revealed once you unlock this listing.

Heat pumpsSolar
11 yrs activeView & unlock

Accredited solar installer

4.7(89)London
Verified accredited

Business name, phone, email and website are revealed once you unlock this listing.

SolarBatteries
7 yrs activeView & unlock

Accredited heat pump installer

4.6(61)Birmingham
Verified accredited

Business name, phone, email and website are revealed once you unlock this listing.

Heat pumpsSolarEV charging
6 yrs activeView & unlock

Incentives

Rebates and grants in United Kingdom

Boiler Upgrade Scheme: £7,500

Homeowners in England and Wales can claim a £7,500 grant towards an air source heat pump installation.

Zero VAT on clean energy kit

Solar panels, batteries and heat pumps carry 0% VAT for residential installations until 2027.

Smart Export Guarantee

Licensed suppliers must pay you for every kWh your solar or battery exports to the grid.

Frequently asked questions

How much do solar panels cost in the UK?

A typical 4kW residential system costs £6,000–£8,500 installed, including scaffolding and MCS certification, and saves roughly £500–£900 a year on electricity.

Are heat pumps expensive to run?

A well-installed air source heat pump running on a heat pump tariff typically costs the same or less than a gas boiler per kWh of heat delivered, and much less once solar is added.

Why does MCS certification matter?

MCS certification is required to claim the Boiler Upgrade Scheme grant, the Smart Export Guarantee and most green mortgages.

How long does an install take?

Solar is usually one day. A heat pump conversion typically takes two to four days including commissioning and radiator upgrades.

Other services in United Kingdom